Katie, June 13, 2016June 16, 2020
This article was published 10 years

Benchmark_Fixperts_1_Red-Cross

This week, Benchmark’s resident Fixpert, Maya Alvarado teams up with Benchmark’s cabinetmaker Max to fit the Red Cross fix, they bring pre-fabricated parts on site and prepare the new storage system ready for use…

09:00: It is Saturday morning, having collected the materials and tools from Benchmark’s workshop, Max and I arrive for opening time at the Red Cross charity shop, Hungerford. Today we will fit the storage system fix to provide more space and easy access for donations.

Benchmark_Fixperts_2_Removing Old Bags2

09:30: Once we have brought all of the tools and pre-fabricated parts into the shop, we begin by removing black bin liners full of donations from the area we will be working in. These are usually packed tight and stacked high, which can prove dangerous and difficult when the team here need to access a bag.

Benchmark_Fixperts_3_Removing Old Shelf

09:45: I remove the existing shelves from their supports because the new ones we are putting in are longer to maximise the space for storage.

Benchmark_Fixperts_4_Winter Stock

09:55: The bags contain donations, which have been sorted, washed, dried and packed by the Red Cross’ staff and volunteers. They are ready to hit the shelves when the season is right and the need for replenishing occurs. They are currently stored upstairs among an array of unsorted items. In order to create more accessible space for separate donations, the new storage system will be made up of four rows of shelving, divided down the middle by the existing partition. We take down the original ‘Winter Stock’ label.

Benchmark_Fixperts_5_String

10:00: Currently there is some plastic string that holds all of the bags up vertically – placing a lot of tension on the material. When one bag needs to be collected, the string is undone causing all of the bags to fall down. The new system will separate the load into quarters – each shelf holding up to three large bags. By extending the shelves, we will provide more space. The inclusion of elastic bungee straps across each shelf at diagonals will hold in any bulging bags, maximising the amount that can be stored. I untie the plastic string and remove it from the baton overhead.

Benchmark_Fixperts_6_String Off2

10:10: We clear away the excess materials from the area, ready to work.

Benchmark_Fixperts_7_Measuring

10:15: Working from the top of the baton downward, we measure and mark evenly spaced shelving to prepare the wall supports. We will work off the existing supports and extend them in width and length to hold the weight of each new shelf safely. Max has a good fix tip to ensure that the screws sit in the wall securely: he cuts up a rawl plug into slithers and fits it into another rawl plug in a predrilled hole, so that the screw locks into both and has a very snug fit. We will use this technique when screwing the softwood supports to the brickwork.

Benchmark_Fixperts_8_Wall

10:30: To extend each support, we drill holes straight through the softwood, hold them up to the baton and drill through to mark the wall. Next, taking away the softwood, we drill pilot holes straight into the brickwork ready to receive each screw.

Benchmark_Fixperts_9_Testing

10:40: I hold the pieces of softwood tight to the wall in the correct position and screw them to the wall.

Benchmark_Fixperts_10_Supports

10:45: Max and I continue this process, using one predrilled softwood block as a template to prepare the others.

Benchmark_Fixperts_11_Drilling

11:00: Having successfully extended the supports, we use a spirit level to get the width extension blocks in position. The intention is to create a greater surface area for the shelves to sit on, given that they will each be taking quite a substantial amount of weight.

Benchmark_Fixperts_12_Drill

11:15: In addition to the existing shelf supports, we add one more row at the top – now we are ready to position the shelves.

Benchmark_Fixperts_13_Marking

11:45: As it is an old building and the walls are not totally even, the shelves sit slightly proud at certain points, so Max marks an exact line of material to remove. We planned them slightly oversized so we would be able to do this – had they been too narrow, we couldn’t have resolved it as easily.

Benchmark_Fixperts_14_Jigsaw

11:55: Using a jigsaw, we cut away the excess using a stepladder as a workbench.

Benchmark_Fixperts_15_First Shelf In

12:05: The first shelf sits in tightly and I use a spirit level to check that it is straight. Once in the correct position, we screw the shelf down to its supports from above.

Benchmark_Fixperts_16_Measuring for shelf

12:20: Following the same process, we measure the space for the next shelf and get it down to the right size and into position.

Benchmark_Fixperts_17_Second Shelf

12:40: With the first row in successfully we know that the process works, so we start to attach the rest of the width extension blocks.

Benchmark_Fixperts_18_Both Drilling

12:50: It is wonderful to work with Max. He has been very generous in sharing his skills and giving me confidence to do more site specific projects. It is great to learn the little tips for making things fit on the day – those that can be applied to other projects. Max screws in the final width extension blocks.
Benchmark_Fixperts_19_Max Drilling

13:00: We place in the other shelves, trimming them to fit the wall where necessary. Again using a spirit level we check that they are straight, and also that the front stands line up. These are there to keep the bags in place and are what we will connect the eyehooks and bungee cords too, rather than the edge of the MDF (medium density fibreboard) which can be feathery and crumble.

Benchmark_Fixperts_20_Spirit Level

13:30: With all the shelves up, we place the ‘Sorted Unsorted’ sign along the top edge. This will communicate to the permanent staff and the volunteers who are not working everyday, what still needs sorting and also where to allocate items. Max holds it in place and we mark where the screws will go. Taking it down again, we drill clearance holes (bigger than the screw) into the sign, and pilot holes (slightly smaller than the screw) into the baton framing to accept the screws.

Benchmark_Fixperts_21_Sign

13:45: We place in the final screws and tug on the sign to ensure that it is locked into place.

Benchmark_Fixperts_22_Sorted

14:00: I have bought some eye-hooks large enough to fit the hook ends of the bungee cords in. By hand, we twist these into pilot holes at each corner of the shelf up stands – using a pair of pliers to make the final turns. Sadly the bungee cords haven’t arrived yet, so we can’t add them today, but I will come back to put them in place during the week and get manager Anne’s feedback for the system.

Benchmark_Fixperts_23_Eye Hooks

14:40: We pack up the tools and material offcuts and take them to the van and hoover up the sawdust to leave the area nice and tidy.

Benchmark_Fixperts_24_Hoover

15:00: It has been a successful day and we are both really excited to hear Anne’s feedback in the week ahead. We leave the Red Cross and head back to Benchmark to offload the van.

Benchmark_Fixperts_25_End

This article was published 10 years
a day in the life Confessions of a Design Geek design for good Furniture Product social design bagsBenchmarkbungee cordscharitycharity shopclothescollaborationcutdesign for gooddonationsdrillFixpertsfurnituremakingMaxMaya Alvaradomeasureone yearproduct designprototypeRed CrossResidencyshelvesshopsignSocialsocial designsortingstorageweightwoodworkshop

Post navigation

Previous post
Next post

Related Posts

Confessions of a Design Geek

photos of numbers :: 4,12,12, 4, 10 & one

August 23, 2013June 16, 2020

This article was published 13 yearsI’m particularly pleased with this week’s photos of numbers collection – the first one’s a blinder, isn’t it?! Knitting needles in a charity shop! The second one was on a tree in the National Trust’s Winkworth Arboretum (kind of like a zoo for trees to…

Read More
Confessions of a Design Geek

out and about :: the new craftsmen

January 2, 2015June 16, 2020

This article was published 12 yearsI’m sharing some of my favourite posts from 2014 all throughout the holidays. This one is about gorgeous Mayfair shop, The New Craftsmen, which champions British craft… I fell in love with The New Craftsmen the moment I popped my head into their Mayfair pop-up…

Read More
Confessions of a Design Geek

interview :: studio ljung ljung

December 2, 2014June 16, 2020

This article was published 12 years I spotted Studio Ljung Ljung’s smoked bamboo lamps, made in collaboration with Thai artisans, at the London Design Festival’s desigjunction. They were exhibited as part of Ventura London, a showcase of new design talent. I caught up with founders Martin Hedenström Ljung and designer…

Read More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

©2026 confessions of a design geek | WordPress Theme by SuperbThemes